Place of Origin:
Jiaxing,China
Brand Name:
SFC
Certification:
UL
Model Number:
SFC-HY67
* UL, cUL-18A 125V AC, 15A 250V AC
* 18 (12)A 250V AC TUV
Key Specifications/Special Features:
STEP 1.Remove front mounting nut from switch bushing.
STEP 2.Put threaded bushing through panel.
STEP 3.Adjust back-up nut to allow the specified number of threads to protrude past front of panel.
STEP 4.If need,install appropriate bushing adaptor.
STEP 5.Install switch boot in place of front mounting nut.
RECOMMENDED INSTALLATION TOOLS:
Six point hex socket wrench.
Spin tite.
Adjustable wrench (without serrated jaws).
for torque setting, consult factory.
Send your inquiry directly to us